High Power Good Performance for CA20 Professional Audio Power Amplifier
The iron core of the toroidal transformer is made of high-quality cold-rolled silicon steel sheets seamlessly rolled, and the coil is evenly wound on the iron core, so that the direction of the magnetic field lines generated by the coil almost completely coincides with the magnetic circuit of the iron core, compared with the laminated transformer. The excitation energy and core loss of the toroidal transformer can be reduced by 25% to 40%. The iron core of the toroidal transformer is wound by silicon steel tape, and has a continuous magnetic circuit, while there is an air gap between the E-piece and the I-piece of the laminated transformer, and there is a large air gap reluctance. main disadvantage. The toroidal core has no air gaps and is processed using vacuum impregnation technology, which makes the core a solid unit, reducing vibration and audible noise.
Specification
Item |
Model |
Rated Power |
Voltage Regulation
(%) |
Effciency(%) |
Weight
(KG) |
Dimension(mm) |
Height |
Diameter |
1 |
HB25 |
25VA |
20 |
73 |
0.4 |
25 |
68 |
2 |
HB30 |
30VA |
16.5 |
76.6 |
0.5 |
25 |
72 |
3 |
HB40 |
40VA |
15.8 |
80.2 |
0.6 |
33 |
79 |
4 |
HB50 |
50VA |
15.2 |
82.4 |
0.7 |
33 |
84 |
5 |
HB63 |
63VA |
13.8 |
83.5 |
0.8 |
34 |
89 |
6 |
HB80 |
80VA |
12.6 |
84.7 |
1 |
34 |
95 |
7 |
HB100 |
100VA |
11.2 |
86.5 |
1.3 |
35 |
105 |
8 |
HB105 |
105VA |
10.8 |
86.8 |
1.4 |
35 |
109 |
9 |
HB125 |
125VA |
9.6 |
87.3 |
1.6 |
40 |
110 |
10 |
HB150 |
150VA |
7.2 |
88.1 |
2 |
42 |
116 |
11 |
HB160 |
160VA |
6.6 |
88.6 |
2.1 |
42 |
118 |
12 |
HB200 |
200VA |
6.1 |
89.7 |
2.4 |
48 |
120 |
13 |
HB250 |
250VA |
5.5 |
90.3 |
2.9 |
50 |
127 |
14 |
HB300 |
300VA |
5.2 |
91.7 |
3.2 |
55 |
128 |
15 |
HB400 |
400VA |
4.6 |
93.8 |
4.7 |
70 |
133 |
16 |
HB500 |
500VA |
4.3 |
94.6 |
5.5 |
72 |
140 |
17 |
HB630 |
630VA |
4.1 |
95 |
6.7 |
72 |
155 |
18 |
HB800 |
800VA |
3.8 |
95.1 |
8.2 |
72 |
170 |
19 |
HB1000 |
1000VA |
3.3 |
95.8 |
10 |
78 |
180 |
20 |
HB1250 |
1250VA |
2.9 |
96.2 |
12.3 |
80 |
198 |
21 |
HB1600 |
1600VA |
2.8 |
96.6 |
14.8 |
86 |
210 |
22 |
HB2000 |
2000VA |
2.5 |
96.9 |
16.9 |
90 |
232 |
23 |
HB2500 |
2500VA |
2.3 |
97.3 |
18.8 |
100 |
245 |
24 |
HB3000 |
3000VA |
2.1 |
97.7 |
21.3 |
110 |
255 |
25 |
HB5000 |
5000VA |
1.9 |
98.1 |
23.8 |
120 |
270 |
Remark:Above standard parameters of general transformer are just for your reference,we can design by your requirements. |
Appliance
Advantagess of toroid core transformer
Production process control of toroidal transformer
1.Each process has corresponding work instructions.
2.Before mass production, the first article confirmation must be finalized and signed by the head of the design department and the quality management department.
3.During the mass production process, IPQC conducts real-time monitoring. If any quality problems are encountered in each process, the quality management team will be immediately organized to analyze the causes of the defects.And make improvement plans with the fastest time.
4.100% inspection of all properties in the production process, such as: no-load current, interlayer insulation, short-time loading test, high voltage test, etc.
5.The test instruments are complete, and all instruments are regularly sent to calibration institutions for calibration. Such as touch current tester, power supply, withstand voltage tester and so on.
6.After the product is finished, the quality management department will conduct random inspection. The packaging department conducts a full inspection of the appearance of the product during packaging. (Appearance inspection includes: finished product size, wire arrangement order, PVC lead wire length, terminals, and whether the appearance is damaged).
7.Packaging and put them in the warehouse.
Quality Control
1.Design ability:
have an independent R&D dept,designed by customer's specs and equipped with sophisticated testing instruments for sample testing and data analysis.
2.Incoming inspection:
1)after inspect the core apperance successfuly,then 100% inspect the iron damage.
2)test the insulation layer of enamelled wire and winding of enamelled wire.
3.Process inspection:
have corresponding working instructions for each process,confirm the first piece before mass production,IPQC carries out real-time monitoring.
4.Packing Assurance:Use standard export cartons,Wooden box or fumigation wooden board are optional by customer's demand,to ensure all products are in good condition to customers.
Corner of our company
Sunhyor is a comprehensive company integrating production, sales and research and development of toroidal transformers.
OEM and ODB are supported.
Two assembly methodes
Delivery
please contact us for the most suitable carrier for you.
Service
FAQ
1.Q:Can I get a sample before placing trial order?
A:Sure,you can.Please contact our sales representative for more details.
2.Q:What's your delivery time?
A:It depends on your order quantity.
Normally,for samples,it takes about 5-7 days;for mass production,it takes about 25-30 days after receiving your deposit.
3.Q:What's your price terms?
A:EXW,FOB,CFR,CIF etc are available.
4.Q:What about your payment terms?
A:TT 50% deposit in advance and balance 50% will be paid off before delivery.
5.Q:Is it support to print my logo on the label?
A:No problems,we can make it as per your requirements.